Case Study · Site Plan Review · Austin, TX

Through completeness 35 days sooner. Into review with the basics done.

A vertical mixed-use redevelopment in Austin went through Noetic's completeness check before it was submitted, while the City of Austin ran its standard completeness check in parallel with all of its reviewers. Noetic then reviewed the same plan set against the city's first round of formal review comments.

98%
Completeness check accuracy
Noetic's agent assessed completeness on a live plan, validated by the city's own reviewers
21
Corrections before submission
Completeness issues the civil firm fixed before the city saw the plans
35
Days saved
By heading off the issues that normally hold a plan back from formal review
82%
Of first-round review issues caught
Of the issues in the city's first formal review letter, Noetic found 82% from the plans alone

The project at a glance

Project type
Vertical mixed-use: apartments over ground-floor commercial
Setting
Urban infill, redeveloping a strip center on a major corridor
Site
About 5 acres, assembled from three parcels
Building
Over 450 homes and 500,000+ square feet, with structured parking
Zoning
Commercial zoning with the city's density bonus program
Plan set
57 sheets and 14 supporting reports and studies
Reviewed for
Completeness, then zoning, site design, transportation, drainage, environmental, water, fire and parks

The site

This was a hard plan to get right the first time. A large residential building over retail, on a small urban footprint, has to satisfy nearly every department at once. On top of that:

  • The site abuts a single-family neighborhood, with the compatibility standards that come with it.
  • It runs along a complex capital improvement project that was still in progress, so the street it fronts was changing under the design.
  • It used the city’s density bonus program, with its own height, open space and ground-floor requirements.
  • Drainage, water quality, protected trees, fire access and right-of-way dedication all had to be resolved together.

This is the kind of project Noetic is built for: commercial and multifamily site plans where many departments review the same set, and one missed detail costs a round. The city’s first formal review of this plan produced 227 comments across eight departments.

Stage one: completeness

In Austin, a site plan does not reach formal review until it passes the city’s completeness check, and most plans do not pass on the first try. Every round costs weeks.

Noetic ran its completeness check on the plan set before submission. It flagged 21 completeness issues, and the civil engineering firm fixed all of them before the plans went to the city. The city then ran its standard completeness check in parallel, with all of its reviewers, and compared the result against Noetic’s. Noetic was 98% accurate.

Noetic’s check also measured every completeness comment against the city’s published completeness requirements. Where a comment asked for something those requirements do not include, the check said so, and the item could move to formal review instead of holding the plan at the gate. That is where the 35 days came from.

35 days

Noetic's completeness check was 98% accurate against the City of Austin's own reviewers. Its 21 corrections before submission, and its clear line between what completeness requires and what it does not, took 35 days out of the path to formal review.

Stage two: formal review

Completeness is the gate. Formal review is where a plan spends most of its time: the city reviews, the letter arrives, the engineer revises, and the plans go back in. The first round is often spent on issues the engineer could have fixed before submitting, if someone had told them.

Noetic reviewed the plan set without seeing the city’s first-round letter, and its findings were compared line by line against it. Noetic found 82% of the issues the city raised, across drainage, environmental, transportation, zoning, site design, water, fire and parks. Among them:

Fire
The building was declared six stories, but its height put it within the city's high-rise definition, which brings a different set of fire and building requirements.
Transportation
The existing right-of-way on the main corridor was narrower than the city's mobility plan requires, so a dedication was needed.
Drainage
The drainage study showed stormwater peak flows leaving the site increasing after construction at several points of discharge, adding to what downstream conveyance must carry. City rules allow no increase for the 2-, 10-, 25- or 100-year storm.
Site Design
Open space in the site data table did not match the landscape plan, and ground-floor commercial space needed a 12-foot minimum ceiling height.
Environmental
The plans did not show that more than 25% of a protected tree's crown would be spared.

Why speed is the point

Every one of those issues is a question the city would otherwise ask after weeks in the queue. When Noetic finds them before submission, they become a revision the engineer makes in days. The plan reaches the city’s reviewers complete and consistent, and the conversation starts on design, not on missing dimensions and mismatched tables.

Scoring method: Noetic’s completeness assessment of the live plan was validated by City of Austin reviewers, who ran the city’s standard completeness check in parallel. The formal review figure compares Noetic’s findings line by line with the city’s first-round master comment report, with each city comment broken into its individual issues. The developer and the civil firm are not named.

Get your next plan through the first time.

Get a demo and see a Noetic completeness check and site plan review on a plan set you are preparing now.